BASED IN WEST KIRBY · SERVING WIRRAL, CHESHIRE & BEYOND0151 203 3996
Discuss your project ↗
INSTALLATION & AFTERCARE

The details matter.
Before and after fitting.

A good installation starts with a clear specification. Here is what to agree with the Stratton team, and how to get help afterwards.

BEFORE YOU ORDER

A complete written scope.

Check the manufacturer and range, opening sizes, layouts, inside and outside colours, glass, furniture and threshold. Your quotation should identify any colour uplift and optional extras.

Agree the fitting work, removal of existing frames, disposal, access, protection and making good. Ask what is included in the price and what needs a separate trade.

BEFORE INSTALLATION

Survey the whole opening.

Final measurements, supporting structure, finished floor levels, drainage, ventilation and access all affect the specification. Designer images and rough measurements help start the conversation; they are not order drawings.

We agree the final specification before ordering. Tell us about restricted access, sea-air exposure, awkward handle positions or any specific accessibility needs.

AT HANDOVER

Understand your new product.

Ask the team to demonstrate normal operation, locking, any access leaf and the correct way to move folding or sliding panels. Check the finish and any agreed making good together.

Keep your final specification, invoice, manufacturer care instructions and applicable guarantee documents together. They help identify the exact product if you need support.

ONGOING CARE

Follow the product’s care guide.

Cleaning and maintenance depend on the frame coating, timber finish, glass and hardware. Coastal and exposed locations can need a different schedule.

Use the instructions supplied for your product. Avoid abrasive cleaners or unapproved chemicals, keep accessible drainage paths clear, and ask us before adjusting hinges or locking components.

GUARANTEES, EXPLAINED

Check each part
of the cover.

A headline manufacturer guarantee does not mean every component or every installation has identical cover.

Manufacturer cover

Frames, coatings, sealed glass units, seals and hardware can have different periods, exclusions and care conditions. Confirm the terms for your chosen range and location.

Installation cover

Ask for Stratton’s written workmanship terms, including the work covered and how to report a problem. Product cover and fitting cover are separate.

Certification & insurance

Ask which completion documents apply to the work and whether any insurance-backed protection is included. The written quotation and handover documents should identify the actual cover.

Need a little help?

Tell us your name, installation postcode, product and what has changed. Include an invoice or order reference if you have it. A short description and a photo or video link help us assess the next step.

Request aftercare ↗
Call our teamDiscuss your project ↗